GLOBAL LEVEL
ENGINEERING SERVICE
Grouting & MIRA 3D GPR SYSTEM & Soil and Geology Technology Leader
GLOBAL LEVEL
ENGINEERING SERVICE
Grouting & MIRA 3D GPR SYSTEM & Soil and Geology Technology Leader
GLOBAL LEVEL
ENGINEERING SERVICE
Grouting & MIRA 3D GPR SYSTEM & Soil and Geology Technology Leader

OUR PRODUCTS
Kwangsung GM is committed to innovation for the highest quality products.
View More


View More

View More

View More

View More
OUR TECHNOLOGY
View More


Co-injection molding steel pipe
With continued economic growth, tunnel construction for industrial infrastructure such as subways and high-speed rail is on the rise.


Continuous Nailing Method Steel Pipe
This method installs pre-fabricated multi-grouting steel pipes to form an umbrella-shaped beam arch, enhancing reinforcement and waterproofing while reducing construction time and cost.


Continuous Steel Pipe Reinforcement Grouting Methods
Drilling a slope, inserting steel pipes with packers, and continuously injecting grout with a mobile packer to reinforce the ground and enhance transfer strength.


Seamless Co-Injection Reinforcement
Pre-installed steel pipes with staged grout injection enhance ground strength, prevent water inflow, and reduce tunnel load and pressure.

OUR COMPANY
View More


OUR Gallery
-
Factory
-
Marketing
-
Factory
-
Marketing
View More
